Stanley & Wencl was hired for a renovation of the Prior Lake, MN VFW Post 6208.
The main level bar and restaurant area will be fully renovated. The new main floor bar and restaurant will be constructed with more seating, new bar equipment and backroom bar facilities including a new cooler. The lower level banquet area will also be improved. Total improved square footage is 7,751.
A primary objective of the remodel is to increase access and provide an ADA compliant main entry. On the main level a new larger stage and upgraded presentation area will be built. The new stage will also be ADA accessible.
Structural enhancements include increasing the span of existing structural steel via upgrades to the legacy framework.
"The renovated VFW Post 6208 will provide the City of Prior Lake and surrounding communities with much needed entertainment, banquet and meeting facilities."
Project Specs:
Contractor: Stanley & Wencl LLC
Design: Kimberly S. Kiger of KSK Designs
Size: 7,751 SF